Replenishment

When to send

Send more when the stock Amazon can sell will not last until a new shipment arrives. Stockout Guard says that as “Runs out within lead time.” Profit Scan says “Reorder now” when that date is today or already past.

What it means

The planner ranks products so the ones that are already out, or about to be, are the ones you see first. “No products will run out within their lead time” means the tracked catalog is covered. “Every tracked product has stock past its lead time” is the same calm result, written on the guard.

The three tiers

  • Out of stock now. Nothing available to sell. Profit Scan uses this same phrase.
  • Runs out within lead time. You still have stock, and it will not last the restock time. Profit Scan’s Reorder now and Reorder by live here.
  • Safe. Stock lasts past the lead time. A weekly figure, if you see one, is what being late would cost. It is not money already lost.

Reorder now

Reorder now is the Profit Scan badge, and it is still the live phrase. It means you will run out before new stock can arrive. Reorder by, with a date, means you still have days. Ship by on Stockout Guard is that date. “Ship-by passed” means the date already went by.

What to do next

Choose Add N to plan on the row, or Plan restock from the Profit Scan line. Fix stranded listing when Amazon has stranded the SKU. Upload unit costs from “Improve accuracy: add unit costs” if profit at risk says Estimated. Confirm a live shipment only when you intend to ship. A shadow check uses your reports and does not create an Amazon inbound plan.

The timing comes from your stock, your in-stock pace, and the restock time, checked by BidVentor so you see what is already out and what is only a warning. We show the tier and the one action. The exact method is ours.